Construction of a new skywalk connecting a new parking ramp at the Sheraton Hotel across to the Greysolon Plaza. A cost-saving pre-finished wall panel system was used along with an engineered structural steel bridge frame to streamline the project while maintaining aesthetics.

Project Size

225 LF

Self Performed
Services Provided

Site work, concrete, reinforcing, structural steel.

Project Markets